Etihad Town Phase 3 Lahore
Strategic capital growth zone on the southern growth corridor. Flexible 2.5 to 3-year installment plans, on-ground infrastructure works, and pre-possession appreciation multiples.
Architectural Blueprint & Investment Analysis
Etihad Town Phase 3 addresses the needs of forward-thinking investors seeking maximum capital appreciation before full possession handovers. Strategically located within minutes of the primary Raiwind Road artery, Phase 3 benefits from rapid earthmoving, road sub-base preparation, and electrical trenching carried out by Etihad Town's heavy machinery fleet.
Unlike fully delivered phases where entry prices reflect fully completed development, Phase 3 allows buyers to acquire premium residential inventory at competitive baseline rates. The 2.5 to 3-year structured installment plan softens cash flow requirements, allowing investors to capture substantial valuation spikes as each milestone (sewerage laying, asphalt carpeting, possession announcement) is reached.
The master scheme includes wide arterial boulevards, a dedicated healthcare campus, institutional schooling zones, and multiple sector parks. For investors targeting 30% to 45% capital upside over a 24-month horizon, Phase 3 represents the ideal investment vehicle.
Project Highlights
Manageable Cash Flow
Structured quarterly installments paired with affordable initial booking down payments.
Pre-Possession Upside
Historical Etihad Town data demonstrates 35–50% capital growth between launch and on-ground possession.
Healthcare Enclave
Reserved sector for a modern specialized multi-bed tertiary medical hospital complex.
Educational Zone
Dedicated campus allocations for premier private schooling institutions.
Authorized Sales Channel Guarantee
Home Finders is an officially accredited marketing partner. All transactions, booking forms, and receipts originate directly from the principal developer ledger. Zero premium manipulation or speculative file trading.
Inspect Authorization CertificateTransparent Pricing & Installment Schedules
Direct developer installment options, down payments, and possession schedules. Verified against official payment circulars.
Phase 3 Structured Installment Schedule (30-Month Tenure)
Quarterly installment breakdown. Balloting and possession fees payable at designated project milestones.
| Plot Size | Total Base Price (PKR) | Booking (20%) | 10 Quarterly Installments | On Possession |
|---|---|---|---|---|
| 3 Marla Residential | PKR 4,600,000 | PKR 920,000 | PKR 276,000 / qtr | PKR 920,000 |
| 5 Marla Residential | PKR 7,800,000 | PKR 1,560,000 | PKR 468,000 / qtr | PKR 1,560,000 |
| 10 Marla Residential | PKR 15,200,000 | PKR 3,040,000 | PKR 912,000 / qtr | PKR 3,040,000 |
| 4 Marla Commercial | PKR 24,000,000 | PKR 4,800,000 | PKR 1,440,000 / qtr | PKR 4,800,000 |
World-Class Infrastructure & Amenities
Engineered to international urban standards with underground electrification, green corridors, and comprehensive municipal utility grids.
Central Theme Park
Vast green expanse featuring athletic fields and jogging trails.
Secure Boundary Wall
Engineered concrete perimeter wall with round-the-clock patrol checkpoints.
Boulevard Network
Main entry boulevard up to 120 feet wide connected to municipal bypasses.
Overhead Water Reservoirs
High-capacity water towers ensuring stable pressure across all lines.
Commute Horizons & Landmark Proximity
Seamless travel via Lahore Ring Road (SL-3 interchange), Raiwind Road artery, and major commercial districts.
Frequently Asked Questions
Direct, factual answers addressing transfer procedures, LDA approvals, construction bylaws, and expected capital returns.
On-ground civil engineering works are actively underway. Heavy earthmovers have leveled the main sectors, trunk sewerage mains are installed, and main boulevard demarcations are visible on-site.
Balloting for sector and plot number allocations is scheduled at the 50% payment milestone. Home Finders ensures our clients receive early ballot eligibility.
The total price stated in the official payment plan covers basic infrastructure. Any external utility connection charges follow official developer circulars announced closer to possession.